| 1 | DUYVIS & WIENER - HOLLAND | 2008 | UT INSPECTION OF COCOA PRESS. | RUUD WOULD |
| 2 | GLOTEC ENGINEERING LIMITED – TEMA. | 2008 | PIPELINES, TANKS & INSTRUMENTATION | Mr. E.S. KIM |
| 3 | TEMA OIL REFINERY - TEMA. | 2008 | BOILERS INSPECTION & INSTRUMENTATION | Mr. E.A. ACQUAH |
| 4 | OIL RIG SEAREX 6 - NIGERIA. | 2008 | RIG TOOLS AND DECK PLATE. | TOOL PUSHER |
| 5 | TAKORADI INTERNATIONAL COMPANY (TICO) – ABOADZI THERMAL PLANT | 2008 | TURBINE INSPECTION. | MAINTENANCE MANAGER |
| 6 | LIEBHERR MINING TARKWA. | 2008 | NDT ON EXCAVATORS. | Mr. DALE CLINTON. |
| 7 | GOLDEN STAR (B0GOSO/PRESTEA) MINES – BOGOSO. | 2008 | ON BIOX TANKS. | Mr. STEVE OFORI |
| 8 | NEWMONT GHANA GOLD LIMITED – AHAFO. | 2008 - TO DATE | NDT ON DRILLING EQUIPMENT. | Mr. THOMAS ALNAA |
| 9 | OSAGYFO POWER BADGE – EFFASO, WESTERN REGION - GHANA. | 2008 | NDT ON TRANSFORMERS. | |
| 10 | CROWN CANS GHANA LIMITED – TEMA. | 2008 | PIPELINES, TOOLS AND EQUIPMENT. | Mr. ABRAHAM DEVEER |
| 11 | RANCEB ENGINEERING - TEMA | 2006 - 2009 | TANKS, BALL TANKS, PRESSURE VESSEL & PIPELINES TEST | Mr. CHARLES ADJIE |
| 12 | CLASTEK COMPANY LIMITED – TEMA | 2008 | TANKS AND PRESSURE VESSELS. | Mr. ANDREW AMOAKO |
| 13 | MEMOT | 2008 | TANKS AND PIPELINES. | Mr. ABDELLA |
| 14 | SEADRILL 6 RIG | 2009 | RIG TOOLS INSPECTION | Mr. ALEN GRABNER |
| 15 | JVC | 2009 | TANK TEST – GHANA, TOGO | Mr. BUTROUS MALI |
| 16 | ORICA-BARBAEX TECHNICAL SERVICES AUSTRALIA & TARKWA | 2009 | INSPECTION & TESTING OF CYANIDE ISOTANKS, | MR. LAWRENCE DENNIS |
| 17 | STONEBRIDGE SHIPPING LINES – NIGERIA | 2009 | GAS FREE TESTING OF CARGO HOLDS. | Mr. ANDREW AMOAKO |
| 18 | CHASE PETROLEUM GHANA LIMITED | 2010 | TANK TEST – GHANA, | Mr. RICHARD SATSI |
| 19 | ORSAM COMPANY – ORTEC GROUP | 2010 | TANK TEST – GHANA, | Mr. STEPHANE |
| 20 | WARTILA ENERGY - FINLAND | 2010 | GENERATOR TEST –LOME | Mr. JARI |
| 21 | WORCON ENGINEERING CONSTRUCTION LIMITED | 2010 | BARGES & TUG BOAT INSPECTION | Mr. OMANI |
| 22 | SEA TRUCKS GROUP - HOLLAND | 2010 | BADGE INSPECTIONS – GHANA, | Mr. CONSTATINE |
| 23 | HD CONTENDER – SOUTH AFRICA | 2010 | MPI ON EQUIPMENT | Mr. DAVID GIBBS |
| 24 | THE ARAB CONTRACTORS OSMAN AHAMED & CO. - EGYPT | 2010 | BARGES & TUG BOAT INSPECTION | Mr. OSAMA ELDESOKY |
| 25 | WILMAR – TEMA, GHANA | 2010 | INSTALLATION OF H P BOILER. | |
| 26 | BLUE OCEAN INVESTMENT - GHANA | 2011 | INSPECTION & TESTING OF TANKS & PIPELINES | Mr. MANTEH |
| 27 | GROUP FIVE INTEGRITY, TARKWA - GHANA | 2011 | INSPECTION & TESTING OF TANKS & PIPELINES | Mr. GERHARD. |
| 28 | SEEDCO ENGINEERING & CONSTRUCTION | 2012 | INSPECTION & TESTING OF TANKS & PIPELINES | Mr. GEORGE DORLESON |
| 29 | NZEMA GOLD GHANA LTD (ADAMUS-ENDEARVOUR GOLD MINE – NKROFUL, GHANA | 2011 TO DATE | INSPECTION & TESTING OF TANKS & PIPELINES MINES EQUIPMENT | Mr. EUGENE BAIDOO. |
| 30 | PUBLIC WORKS (PW) ACCRA - GHANA | 2011 | KIA FUEL HYDRANT PIPELINES PROJECT | Mr. ATTIE. |
| 31 | REDIS AFRICAN CONSTRUCTION | 2015 | WELDER QUALIFICATION TEST | Mr. DUANE SWARTZ |
| 32 | SANDVIK MINING GHANA LTD | 2015 | INSPECTION & TESTING OF DRILL EQUIPMENT | |
| 33 | VIVO ENERGY (SHELL) GHANA LTD | 2015 | TANKS & PIPELINE INTEGRITY TEST | |
| 34 | PW GHANA LIMITED - GHANA | 2015 TO DATE | NDT TEST OF KIA FUEL HYDRANT PIPELINES | |
| 35 | PUMA ENERGY – GHANA. | 2015 | NDT TEST OF KIA FUEL HYDRANT PIPELINES | |
| 36 | TOP INTERNATIONAL ENGINEERING COMPANY. | 2015 | NDT TEST – NEW TANKS & PIPELINES, TEMA. | |
| 37 | HASMAN COMPANY LTD – ACCRA (AMERI POWER PLANT) | 2015 | NDT TEST OF GAS AND WATER HYDRANT LLINESPIPELINES | |
| 38 | MEMOT ENGINEERING LIMITED. (FUEL TRADE) | 2016 | NDT TEST OF STRUCTURES TANKS & PIPELINES | |
| 39 | GROUP FIVE POWER PLANT (KPONE INDEPENDENT POWER PLANT) | 2016 | NDT TEST OF STRUCTURES TANKS & PIPELINES | Mr. Ganga |
| 40 | METSO MINING GHANA | | NDT ON MINING EQUIPMENT | |
| 41 | MEMOT ENGINEERING LIMITED. (AKSA 350 MW POWER PLANT) | 2016 | NDT TEST OF STRUCTURES TANKS & PIPELINES | |
| 42 | CHEMIE-TECH ENGINEERING LIMITED. AUE – QUANTUM FUEL TERMINAL | 2016 | NDT TEST OF STRUCTURES TANKS & PIPELINES | |